The Laboratory

All our products are subjected to pre- and final testing. The final testing phase confirms that each product meets the technical and dimensional specifications required.

The laboratory is equipped to perform all the standard tests required by CEI and IEC Regulations.

Our equipment includes:

  • Power supply control panels tested up to a voltage of 1000 V at different frequencies (50-60-75-100 HZ)
  • Low voltage power supply control panels up to 2000 A
  • Network analyzer (Chauvin Arnoux)
  • Digital multimeters (Fluke 45)
  • Oscillographic recorder (Yokogawa)
  • Digital watt meters (Yokogawa)
  • Resistance measurement
  • Measure of dielectric strength up to 100 KV
  • Lightning impulse test up to 200 KV